IRR E0770 Thompson over Sand Creek
FairLincoln County, Oklahoma · 2 N 3.9 E of SH105/US177 · Structure no. 316950000000000
- Built
- 2016
- 9 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 54 ft
- 1 main span
- Daily traffic
- 100
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
IRR E0770 Thompson over Sand Creek is a steel stringer/multi-beam or girder carrying IRR E0770 Thompson over Sand Creek in Lincoln County, Oklahoma. It was built in 2016, so it is 9 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 160 by 2042. The structure is 54 ft (16.5 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR E0770 Thompson over Sand Creek built?
It was built in 2016, making it 9 years old in 2025.
What condition is IRR E0770 Thompson over Sand Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does IRR E0770 Thompson over Sand Creek carry?
About 100 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is IRR E0770 Thompson over Sand Creek?
The structure is 54 ft (16.5 m) long with a longest span of 54 ft (16.5 m) and a deck 27 ft wide.
Who owns IRR E0770 Thompson over Sand Creek?
It is owned by the County Highway Agency.