US Bridges

Turner Tp (I-44) over County RD NS-3410 under

Good

Lincoln County, Oklahoma · 28 E I-35 · Structure no. 312520000000000

Built
2013
12 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
70 ft
1 main span
Daily traffic
24,900
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

Turner Tp (I-44) over County RD NS-3410 under is a prestressed concrete stringer/multi-beam or girder carrying Turner Tp (I-44) over County RD NS-3410 under in Lincoln County, Oklahoma. It was built in 2013, so it is 12 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,900 vehicles a day, roughly 36% of them trucks, projected to reach 38,400 by 2042. The structure is 70 ft (21.3 m) long and 91 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesTurner Tp (I-44)
CrossesCounty RD NS-3410 under
Location28 E I-35
RouteInterstate 44
Coordinates35.70613, -96.94672
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating75.6 US tons
Inventory rating42 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length70 ft (21.3 m)
Longest span68 ft (20.7 m)
Deck width91 ft (27.6 m)
Roadway width87 ft (26.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,900 (2022)
Projected traffic38,400 by 2042
Trucks36%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed11.8 mi (19 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Turner Tp (I-44) over County RD NS-3410 under built?

It was built in 2013, making it 12 years old in 2025.

What condition is Turner Tp (I-44) over County RD NS-3410 under in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Turner Tp (I-44) over County RD NS-3410 under carry?

About 24,900 vehicles per day (2022 count), of which roughly 36% are trucks.

How long is Turner Tp (I-44) over County RD NS-3410 under?

The structure is 70 ft (21.3 m) long with a longest span of 68 ft (20.7 m) and a deck 91 ft wide.

Who owns Turner Tp (I-44) over County RD NS-3410 under?

It is owned by the State Toll Authority.