US Bridges

N4750 over Lost Poteau River

Fair

Le Flore County, Oklahoma · 2.6 S 2.5 W of Cameron · Structure no. 333320000000000

Built
2023
2 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
47 ft
1 main span
Daily traffic
50
2023 count
Owner
County
County Highway Agency

About this bridge

N4750 over Lost Poteau River is a steel stringer/multi-beam or girder carrying N4750 over Lost Poteau River in Le Flore County, Oklahoma. It was built in 2023, so it is 2 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 80 by 2043. The structure is 47 ft (14.3 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).

Location

No coordinates are recorded for this structure.

CarriesN4750
CrossesLost Poteau River
Location2.6 S 2.5 W of Cameron
RouteCounty Highway N4750
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating110.1 US tons
Inventory rating74 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length47 ft (14.3 m)
Longest span47 ft (14.3 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic50 (2023)
Projected traffic80 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N4750 over Lost Poteau River built?

It was built in 2023, making it 2 years old in 2025.

What condition is N4750 over Lost Poteau River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does N4750 over Lost Poteau River carry?

About 50 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is N4750 over Lost Poteau River?

The structure is 47 ft (14.3 m) long with a longest span of 47 ft (14.3 m) and a deck 24 ft wide.

Who owns N4750 over Lost Poteau River?

It is owned by the County Highway Agency.