4082C over Fourche Maline Creek
GoodLe Flore County, Oklahoma · 2N of Leflore · Structure no. 297400000000000
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 253 ft
- 3 main spans
- Daily traffic
- 150
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
4082C over Fourche Maline Creek is a prestressed concrete stringer/multi-beam or girder carrying 4082C over Fourche Maline Creek in Le Flore County, Oklahoma. It was built in 2014, so it is 11 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 150 vehicles a day, roughly 15% of them trucks, projected to reach 240 by 2042. The structure is 253 ft (77.1 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 4082C over Fourche Maline Creek built?
It was built in 2014, making it 11 years old in 2025.
What condition is 4082C over Fourche Maline Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does 4082C over Fourche Maline Creek carry?
About 150 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is 4082C over Fourche Maline Creek?
The structure is 253 ft (77.1 m) long with a longest span of 91 ft (27.8 m) and a deck 28 ft wide.
Who owns 4082C over Fourche Maline Creek?
It is owned by the County Highway Agency.