Fdr 6026 over Drain
FairLe Flore County, Oklahoma · 1.1 MI S of HWY 63 · Structure no. 080906000001090
- Built
- 2001
- 24 years old
- Condition
- Fair
- inspected March 2024
- Type
- Culvert
- Steel
- Length
- 28 ft
- 3 main spans
- Daily traffic
- 50
- 1992 count
- Owner
- Federal
- U.S. Forest Service
About this bridge
Fdr 6026 over Drain is a steel culvert carrying Fdr 6026 over Drain in Le Flore County, Oklahoma. It was built in 2001, so it is 24 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 34.8 mi (56 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fdr 6026 over Drain built?
It was built in 2001, making it 24 years old in 2025.
What condition is Fdr 6026 over Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Fdr 6026 over Drain carry?
About 50 vehicles per day (1992 count).
How long is Fdr 6026 over Drain?
The structure is 28 ft (8.5 m) long with a longest span of 7 ft (2.1 m).
Who owns Fdr 6026 over Drain?
It is owned by the U.S. Forest Service.