3930C over Fourche Maline Creek
FairLatimer County, Oklahoma · 3.5 W 2.4 S of Red Oak · Structure no. 228250000000000
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 102 ft
- 1 main span
- Daily traffic
- 100
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
3930C over Fourche Maline Creek is a prestressed concrete stringer/multi-beam or girder carrying 3930C over Fourche Maline Creek in Latimer County, Oklahoma. It was built in 1991, so it is 34 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 15% of them trucks, projected to reach 160 by 2042. The structure is 102 ft (31.2 m) long and 29 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 3930C over Fourche Maline Creek built?
It was built in 1991, making it 34 years old in 2025.
What condition is 3930C over Fourche Maline Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does 3930C over Fourche Maline Creek carry?
About 100 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is 3930C over Fourche Maline Creek?
The structure is 102 ft (31.2 m) long with a longest span of 100 ft (30.5 m) and a deck 29 ft wide.
Who owns 3930C over Fourche Maline Creek?
It is owned by the County Highway Agency.