US Bridges

N3310 (waverly St) over Creek

Good

Kay County, Oklahoma · .2N of Highland Ave · Structure no. 305110000000000

Built
1995
30 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
41 ft
3 main spans
Daily traffic
3,183
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

N3310 (waverly St) over Creek is a concrete culvert carrying N3310 (waverly St) over Creek in Kay County, Oklahoma. It was built in 1995, so it is 30 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,183 vehicles a day, roughly 5% of them trucks, projected to reach 160 by 2042. The structure is 41 ft (12.5 m) long and 58 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesN3310 (waverly St)
CrossesCreek
Location.2N of Highland Ave
RouteCity Street N3310
Coordinates36.71208, -97.10324
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating41.4 US tons
Inventory rating24.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length41 ft (12.5 m)
Longest span13 ft (4 m)
Deck width58 ft (17.7 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,183 (2022)
Projected traffic160 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$100,000
NavigationNo navigation control on waterway

Frequently asked questions

When was N3310 (waverly St) over Creek built?

It was built in 1995, making it 30 years old in 2025.

What condition is N3310 (waverly St) over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does N3310 (waverly St) over Creek carry?

About 3,183 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is N3310 (waverly St) over Creek?

The structure is 41 ft (12.5 m) long with a longest span of 13 ft (4 m) and a deck 58 ft wide.

Who owns N3310 (waverly St) over Creek?

It is owned by the City or Municipal Highway Agency.