IRR E0260 over Bois Darc Creek
GoodKay County, Oklahoma · 3.5S 1E of US60 & SH156 · Structure no. 252220000000000
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 178 ft
- 3 main spans
- Daily traffic
- 60
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
IRR E0260 over Bois Darc Creek is a prestressed concrete stringer/multi-beam or girder carrying IRR E0260 over Bois Darc Creek in Kay County, Oklahoma. It was built in 1997, so it is 28 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 60 vehicles a day, roughly 10% of them trucks, projected to reach 96 by 2042. The structure is 178 ft (54.3 m) long and 29 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR E0260 over Bois Darc Creek built?
It was built in 1997, making it 28 years old in 2025.
What condition is IRR E0260 over Bois Darc Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does IRR E0260 over Bois Darc Creek carry?
About 60 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is IRR E0260 over Bois Darc Creek?
The structure is 178 ft (54.3 m) long with a longest span of 75 ft (22.9 m) and a deck 29 ft wide.
Who owns IRR E0260 over Bois Darc Creek?
It is owned by the County Highway Agency.