US Bridges

N1960 over Turkey Creek

Good

Jackson County, Oklahoma · 8W .8S US62/US283 Altus · Structure no. 279210000000000

Built
2005
20 years old
Condition
Good
inspected July 2024
Type
Tee Beam
Prestressed Concrete
Length
135 ft
3 main spans
Daily traffic
100
2022 count
Owner
County
County Highway Agency

About this bridge

N1960 over Turkey Creek is a prestressed concrete tee beam carrying N1960 over Turkey Creek in Jackson County, Oklahoma. It was built in 2005, so it is 20 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 15% of them trucks, projected to reach 160 by 2042. The structure is 135 ft (41.1 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesN1960
CrossesTurkey Creek
Location8W .8S US62/US283 Altus
RouteCounty Highway N1960
Coordinates34.62612, -99.47439
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72 US tons
Inventory rating39 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length135 ft (41.1 m)
Longest span45 ft (13.7 m)
Deck width28 ft (8.5 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic160 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$787,000
NavigationNo navigation control on waterway

Frequently asked questions

When was N1960 over Turkey Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is N1960 over Turkey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does N1960 over Turkey Creek carry?

About 100 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is N1960 over Turkey Creek?

The structure is 135 ft (41.1 m) long with a longest span of 45 ft (13.7 m) and a deck 28 ft wide.

Who owns N1960 over Turkey Creek?

It is owned by the County Highway Agency.