US Bridges

U.S. 62 over North Fork of Red River

Good

Jackson County, Oklahoma · Jackson-Tillman C/L · Structure no. 173580000000000

Built
1968
57 years old, rebuilt 1992
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,606 ft
16 main spans
Daily traffic
2,350
2022 count
Owner
State
State Highway Agency

About this bridge

U.S. 62 over North Fork of Red River is a steel continuous stringer/multi-beam or girder carrying U.S. 62 over North Fork of Red River in Jackson County, Oklahoma. It was built in 1968 and reconstructed in 1992, so it is 57 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,350 vehicles a day, roughly 25% of them trucks, projected to reach 3,760 by 2042. The structure is 1,606 ft (489.5 m) long and 40 ft wide.

CarriesU.S. 62
CrossesNorth Fork of Red River
LocationJackson-Tillman C/L
RouteU.S. Route 62
Coordinates34.63821, -99.10551
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55 US tons
Inventory rating33 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans16
Design loadHS 20
Structure length1,606 ft (489.5 m)
Longest span100 ft (30.5 m)
Deck width40 ft (12.2 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,350 (2022)
Projected traffic3,760 by 2042
Trucks25%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$8.1 million
NavigationNo navigation control on waterway

Frequently asked questions

When was U.S. 62 over North Fork of Red River built?

It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1992.

What condition is U.S. 62 over North Fork of Red River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does U.S. 62 over North Fork of Red River carry?

About 2,350 vehicles per day (2022 count), of which roughly 25% are trucks.

How long is U.S. 62 over North Fork of Red River?

The structure is 1,606 ft (489.5 m) long with a longest span of 100 ft (30.5 m) and a deck 40 ft wide.

Who owns U.S. 62 over North Fork of Red River?

It is owned by the State Highway Agency.