US Bridges

N4370 over San Bois Creek

Good

Haskell County, Oklahoma · 1.5 S of Kinta · Structure no. 199730000000000

Built
1981
44 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
151 ft
3 main spans
Daily traffic
100
2022 count
Owner
County
County Highway Agency

About this bridge

N4370 over San Bois Creek is a prestressed concrete stringer/multi-beam or girder carrying N4370 over San Bois Creek in Haskell County, Oklahoma. It was built in 1981, so it is 44 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 160 by 2042. The structure is 151 ft (46 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesN4370
CrossesSan Bois Creek
Location1.5 S of Kinta
RouteCounty Highway N4370
Coordinates35.10103, -95.24399
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating45.2 US tons
Inventory rating35.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length151 ft (46 m)
Longest span51 ft (15.5 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic160 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$612,000
NavigationNo navigation control on waterway

Frequently asked questions

When was N4370 over San Bois Creek built?

It was built in 1981, making it 44 years old in 2025.

What condition is N4370 over San Bois Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does N4370 over San Bois Creek carry?

About 100 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is N4370 over San Bois Creek?

The structure is 151 ft (46 m) long with a longest span of 51 ft (15.5 m) and a deck 28 ft wide.

Who owns N4370 over San Bois Creek?

It is owned by the County Highway Agency.