N2850 over Salt Creek
GoodPosted for loadGrady County, Oklahoma · 1.5N 2E of Pocasset · Structure no. 299280000000000
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 90 ft
- 1 main span
- Daily traffic
- 100
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
N2850 over Salt Creek is a prestressed concrete stringer/multi-beam or girder carrying N2850 over Salt Creek in Grady County, Oklahoma. It was built in 2013, so it is 12 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 160 by 2042. The structure is 90 ft (27.4 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was N2850 over Salt Creek built?
It was built in 2013, making it 12 years old in 2025.
What condition is N2850 over Salt Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does N2850 over Salt Creek carry?
About 100 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is N2850 over Salt Creek?
The structure is 90 ft (27.4 m) long with a longest span of 90 ft (27.4 m) and a deck 28 ft wide.
Who owns N2850 over Salt Creek?
It is owned by the County Highway Agency.