FAU 4030(GRAND Ave over Creek
FairGrady County, Oklahoma · .4E of US81 on Grand Ave · Structure no. 217490000000000
- Built
- 1988
- 37 years old, rebuilt 2006
- Condition
- Fair
- inspected February 2023
- Type
- Culvert
- Steel
- Length
- 21 ft
- 3 main spans
- Daily traffic
- 847
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 4030(GRAND Ave over Creek is a steel culvert carrying FAU 4030(GRAND Ave over Creek in Grady County, Oklahoma. It was built in 1988 and reconstructed in 2006, so it is 37 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 847 vehicles a day, roughly 10% of them trucks, projected to reach 1,355 by 2042. The structure is 21 ft (6.4 m) long and 48 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 4030(GRAND Ave over Creek built?
It was built in 1988, making it 37 years old in 2025. It was reconstructed in 2006.
What condition is FAU 4030(GRAND Ave over Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does FAU 4030(GRAND Ave over Creek carry?
About 847 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is FAU 4030(GRAND Ave over Creek?
The structure is 21 ft (6.4 m) long with a longest span of 5 ft (1.4 m) and a deck 48 ft wide.
Who owns FAU 4030(GRAND Ave over Creek?
It is owned by the City or Municipal Highway Agency.