US Bridges

U.S. 81 over Salt Creek

Good

Grady County, Oklahoma · 6.9 MI N US62 · Structure no. 190670000000000

Built
1975
50 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
182 ft
3 main spans
Daily traffic
3,500
2022 count
Owner
State
State Highway Agency

About this bridge

U.S. 81 over Salt Creek is a prestressed concrete stringer/multi-beam or girder carrying U.S. 81 over Salt Creek in Grady County, Oklahoma. It was built in 1975, so it is 50 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,500 vehicles a day, roughly 25% of them trucks, projected to reach 5,600 by 2042. The structure is 182 ft (55.5 m) long and 46 ft wide. If it were closed, the detour would be 32.9 mi (53 km).

CarriesU.S. 81
CrossesSalt Creek
Location6.9 MI N US62
RouteU.S. Route 81
Coordinates35.15614, -97.95409
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46 US tons
Inventory rating28 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length182 ft (55.5 m)
Longest span60 ft (18.3 m)
Deck width46 ft (13.9 m)
Roadway width43 ft (13 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,500 (2022)
Projected traffic5,600 by 2042
Trucks25%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed32.9 mi (53 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2 million
NavigationNo navigation control on waterway

Frequently asked questions

When was U.S. 81 over Salt Creek built?

It was built in 1975, making it 50 years old in 2025.

What condition is U.S. 81 over Salt Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does U.S. 81 over Salt Creek carry?

About 3,500 vehicles per day (2022 count), of which roughly 25% are trucks.

How long is U.S. 81 over Salt Creek?

The structure is 182 ft (55.5 m) long with a longest span of 60 ft (18.3 m) and a deck 46 ft wide.

Who owns U.S. 81 over Salt Creek?

It is owned by the State Highway Agency.