US Bridges

E0430 over Creek

FairPosted for load

Garfield County, Oklahoma · At US 64/30 ST · Structure no. 013950000000000

Built
1924
101 years old
Condition
Fair
inspected August 2023
Type
Arch - Deck
Concrete
Length
60 ft
1 main span
Daily traffic
250
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E0430 over Creek is a concrete arch - deck carrying E0430 over Creek in Garfield County, Oklahoma. It was built in 1924, so it is 101 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 250 vehicles a day, roughly 10% of them trucks, projected to reach 400 by 2042. The structure is 60 ft (18.3 m) long and 23 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesE0430
CrossesCreek
LocationAt US 64/30 ST
RouteCity Street E0430
Coordinates36.39074, -97.83329
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.5 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 15
Structure length60 ft (18.3 m)
Longest span60 ft (18.3 m)
Deck width23 ft (6.9 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250 (2022)
Projected traffic400 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusEligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$373,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E0430 over Creek built?

It was built in 1924, making it 101 years old in 2025.

What condition is E0430 over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does E0430 over Creek carry?

About 250 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is E0430 over Creek?

The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 23 ft wide.

Who owns E0430 over Creek?

It is owned by the City or Municipal Highway Agency.