US Bridges

E0800 over Quarter Master Creek

Good

Dewey County, Oklahoma · 1. S .8 W of Leedy · Structure no. 233240000000000

Built
1993
32 years old
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
21 ft
2 main spans
Daily traffic
25
2022 count
Owner
County
County Highway Agency

About this bridge

E0800 over Quarter Master Creek is a concrete culvert carrying E0800 over Quarter Master Creek in Dewey County, Oklahoma. It was built in 1993, so it is 32 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, roughly 10% of them trucks, projected to reach 40 by 2042. The structure is 21 ft (6.4 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesE0800
CrossesQuarter Master Creek
Location1. S .8 W of Leedy
RouteCounty Highway E0800
Coordinates35.85556, -99.35547
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length21 ft (6.4 m)
Longest span10 ft (3 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2022)
Projected traffic40 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E0800 over Quarter Master Creek built?

It was built in 1993, making it 32 years old in 2025.

What condition is E0800 over Quarter Master Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does E0800 over Quarter Master Creek carry?

About 25 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is E0800 over Quarter Master Creek?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m) and a deck 28 ft wide.

Who owns E0800 over Quarter Master Creek?

It is owned by the County Highway Agency.