US Bridges

S.H. 34 over Quarter Master Creek

Good

Custer County, Oklahoma · 4.7 MI N JCT S.H. 33 · Structure no. 252040000000000

Built
1997
28 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
262 ft
4 main spans
Daily traffic
1,300
2022 count
Owner
State
State Highway Agency

About this bridge

S.H. 34 over Quarter Master Creek is a prestressed concrete stringer/multi-beam or girder carrying S.H. 34 over Quarter Master Creek in Custer County, Oklahoma. It was built in 1997, so it is 28 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,300 vehicles a day, roughly 16% of them trucks, projected to reach 2,080 by 2042. The structure is 262 ft (79.9 m) long and 42 ft wide. If it were closed, the detour would be 47.2 mi (76 km).

CarriesS.H. 34
CrossesQuarter Master Creek
Location4.7 MI N JCT S.H. 33
RouteState Highway 34
Coordinates35.70261, -99.35789
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating42 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4 (+3 approach)
Design loadHS 20
Structure length262 ft (79.9 m)
Longest span78 ft (23.8 m)
Deck width42 ft (12.8 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,300 (2022)
Projected traffic2,080 by 2042
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed47.2 mi (76 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2.3 million
NavigationNo navigation control on waterway

Frequently asked questions

When was S.H. 34 over Quarter Master Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is S.H. 34 over Quarter Master Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does S.H. 34 over Quarter Master Creek carry?

About 1,300 vehicles per day (2022 count), of which roughly 16% are trucks.

How long is S.H. 34 over Quarter Master Creek?

The structure is 262 ft (79.9 m) long with a longest span of 78 ft (23.8 m) and a deck 42 ft wide.

Who owns S.H. 34 over Quarter Master Creek?

It is owned by the State Highway Agency.