S.H. 33 over Canadian River
FairCuster County, Oklahoma · 2.6 MI S Dewey C/L · Structure no. 211310000000000
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 3,202 ft
- 32 main spans
- Daily traffic
- 1,400
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
S.H. 33 over Canadian River is a prestressed concrete stringer/multi-beam or girder carrying S.H. 33 over Canadian River in Custer County, Oklahoma. It was built in 1985, so it is 40 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,400 vehicles a day, roughly 16% of them trucks, projected to reach 2,240 by 2042. The structure is 3,202 ft (976 m) long and 42 ft wide. If it were closed, the detour would be 70.2 mi (113 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S.H. 33 over Canadian River built?
It was built in 1985, making it 40 years old in 2025.
What condition is S.H. 33 over Canadian River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does S.H. 33 over Canadian River carry?
About 1,400 vehicles per day (2022 count), of which roughly 16% are trucks.
How long is S.H. 33 over Canadian River?
The structure is 3,202 ft (976 m) long with a longest span of 100 ft (30.5 m) and a deck 42 ft wide.
Who owns S.H. 33 over Canadian River?
It is owned by the State Highway Agency.