I-40 EB over Washita Riv.& Co. RD Und
FairCuster County, Oklahoma · 1.3 MI E JCT US 183 · Structure no. 175970000000000
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 603 ft
- 6 main spans
- Daily traffic
- 9,950
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 EB over Washita Riv.& Co. RD Und is a steel continuous stringer/multi-beam or girder carrying I-40 EB over Washita Riv.& Co. RD Und in Custer County, Oklahoma. It was built in 1969, so it is 56 years old, older than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,950 vehicles a day, roughly 36% of them trucks, projected to reach 15,920 by 2042. The structure is 603 ft (183.8 m) long and 40 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 EB over Washita Riv.& Co. RD Und built?
It was built in 1969, making it 56 years old in 2025.
What condition is I-40 EB over Washita Riv.& Co. RD Und in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does I-40 EB over Washita Riv.& Co. RD Und carry?
About 9,950 vehicles per day (2022 count), of which roughly 36% are trucks.
How long is I-40 EB over Washita Riv.& Co. RD Und?
The structure is 603 ft (183.8 m) long with a longest span of 100 ft (30.5 m) and a deck 40 ft wide.
Who owns I-40 EB over Washita Riv.& Co. RD Und?
It is owned by the State Highway Agency.