US Bridges

Travis Dairy Rd. over I-40 under

Good

Custer County, Oklahoma · 0.7 MI E JCT I-40 Bus · Structure no. 151390000000000

Built
1960
65 years old
Condition
Good
inspected September 2024
Type
Slab
Concrete Continuous
Length
175 ft
4 main spans
Daily traffic
200
2022 count
Owner
State
State Highway Agency

About this bridge

Travis Dairy Rd. over I-40 under is a concrete continuous slab carrying Travis Dairy Rd. over I-40 under in Custer County, Oklahoma. It was built in 1960, so it is 65 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 18% of them trucks, projected to reach 320 by 2042. The structure is 175 ft (53.3 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTravis Dairy Rd.
CrossesI-40 under
Location0.7 MI E JCT I-40 Bus
RouteCounty Highway N2300
Coordinates35.51583, -98.90583
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating84 US tons
Inventory rating31 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 20
Structure length175 ft (53.3 m)
Longest span55 ft (16.8 m)
Deck width29 ft (8.8 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic320 by 2042
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.9 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Travis Dairy Rd. over I-40 under built?

It was built in 1960, making it 65 years old in 2025.

What condition is Travis Dairy Rd. over I-40 under in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Travis Dairy Rd. over I-40 under carry?

About 200 vehicles per day (2022 count), of which roughly 18% are trucks.

How long is Travis Dairy Rd. over I-40 under?

The structure is 175 ft (53.3 m) long with a longest span of 55 ft (16.8 m) and a deck 29 ft wide.

Who owns Travis Dairy Rd. over I-40 under?

It is owned by the State Highway Agency.