I-40 Frontage Rd. over Hackberry Creek
FairCuster County, Oklahoma · 4.2 MI NE Washita C/L · Structure no. 018660000000000
- Built
- 1927
- 98 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 43 ft
- 1 main span
- Daily traffic
- 100
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-40 Frontage Rd. over Hackberry Creek is a steel stringer/multi-beam or girder carrying I-40 Frontage Rd. over Hackberry Creek in Custer County, Oklahoma. It was built in 1927, so it is 98 years old, older than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 36% of them trucks, projected to reach 160 by 2042. The structure is 43 ft (13.1 m) long and 23 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-40 Frontage Rd. over Hackberry Creek built?
It was built in 1927, making it 98 years old in 2025.
What condition is I-40 Frontage Rd. over Hackberry Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does I-40 Frontage Rd. over Hackberry Creek carry?
About 100 vehicles per day (2022 count), of which roughly 36% are trucks.
How long is I-40 Frontage Rd. over Hackberry Creek?
The structure is 43 ft (13.1 m) long with a longest span of 40 ft (12.2 m) and a deck 23 ft wide.
Who owns I-40 Frontage Rd. over Hackberry Creek?
It is owned by the State Highway Agency.