US Bridges

S.H. 66 WB over Turner Tp (I-44) under

Good

Creek County, Oklahoma · .1E of Turnpike Gate · Structure no. 327180000000000

Built
2024
1 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
265 ft
2 main spans
Daily traffic
22,300
2022 count
Owner
State
State Highway Agency

About this bridge

S.H. 66 WB over Turner Tp (I-44) under is a prestressed concrete stringer/multi-beam or girder carrying S.H. 66 WB over Turner Tp (I-44) under in Creek County, Oklahoma. It was built in 2024, so it is 1 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,300 vehicles a day, roughly 5% of them trucks, projected to reach 35,680 by 2042. The structure is 265 ft (80.8 m) long and 47 ft wide.

CarriesS.H. 66 WB
CrossesTurner Tp (I-44) under
Location.1E of Turnpike Gate
RouteState Highway 66
Coordinates36.07277, -96.05802
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85.5 US tons
Inventory rating49.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length265 ft (80.8 m)
Longest span133 ft (40.4 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,300 (2022)
Projected traffic35,680 by 2042
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S.H. 66 WB over Turner Tp (I-44) under built?

It was built in 2024, making it 1 years old in 2025.

What condition is S.H. 66 WB over Turner Tp (I-44) under in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does S.H. 66 WB over Turner Tp (I-44) under carry?

About 22,300 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is S.H. 66 WB over Turner Tp (I-44) under?

The structure is 265 ft (80.8 m) long with a longest span of 133 ft (40.4 m) and a deck 47 ft wide.

Who owns S.H. 66 WB over Turner Tp (I-44) under?

It is owned by the State Highway Agency.