US Bridges

E. 91st St. over Polecat Creek Trib.

Fair

Creek County, Oklahoma · .25E Brenner Rd. · Structure no. 280250000000000

Built
2004
21 years old
Condition
Fair
inspected August 2023
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
500
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E. 91st St. over Polecat Creek Trib. is a concrete culvert carrying E. 91st St. over Polecat Creek Trib. in Creek County, Oklahoma. It was built in 2004, so it is 21 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 500 vehicles a day, roughly 15% of them trucks, projected to reach 800 by 2042. The structure is 23 ft (6.9 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE. 91st St.
CrossesPolecat Creek Trib.
Location.25E Brenner Rd.
RouteCity Street E0680
Coordinates36.03196, -96.07883
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating36 US tons
Inventory rating21.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length23 ft (6.9 m)
Longest span10 ft (3 m)
Deck width29 ft (8.8 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2022)
Projected traffic800 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.2 million
NavigationNo navigation control on waterway

Frequently asked questions

When was E. 91st St. over Polecat Creek Trib. built?

It was built in 2004, making it 21 years old in 2025.

What condition is E. 91st St. over Polecat Creek Trib. in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does E. 91st St. over Polecat Creek Trib. carry?

About 500 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is E. 91st St. over Polecat Creek Trib.?

The structure is 23 ft (6.9 m) long with a longest span of 10 ft (3 m) and a deck 29 ft wide.

Who owns E. 91st St. over Polecat Creek Trib.?

It is owned by the City or Municipal Highway Agency.