Mackenzie Hill RD over Pecan Creek
GoodComanche County, Oklahoma · Fort Sill · Structure no. DAPTRASIL0PB101
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected July 2024
- Type
- Culvert
- Concrete
- Length
- 26 ft
- 3 main spans
- Daily traffic
- 400
- 2024 count
- Owner
- Federal
- Army
About this bridge
Mackenzie Hill RD over Pecan Creek is a concrete culvert carrying Mackenzie Hill RD over Pecan Creek in Comanche County, Oklahoma. It was built in 2019, so it is 6 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 400 vehicles a day, roughly 10% of them trucks, projected to reach 400 by 2046. The structure is 26 ft (7.8 m) long. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mackenzie Hill RD over Pecan Creek built?
It was built in 2019, making it 6 years old in 2025.
What condition is Mackenzie Hill RD over Pecan Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Mackenzie Hill RD over Pecan Creek carry?
About 400 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Mackenzie Hill RD over Pecan Creek?
The structure is 26 ft (7.8 m) long with a longest span of 8 ft (2.4 m).
Who owns Mackenzie Hill RD over Pecan Creek?
It is owned by the Army.