US Bridges

E1680 Bishop RD over Trib to Wolf Creek

Good

Comanche County, Oklahoma · .31E JCT SW 52nd ST · Structure no. 327570000000000

Built
2019
6 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
91 ft
4 main spans
Daily traffic
1,300
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E1680 Bishop RD over Trib to Wolf Creek is a concrete culvert carrying E1680 Bishop RD over Trib to Wolf Creek in Comanche County, Oklahoma. It was built in 2019, so it is 6 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,300 vehicles a day, roughly 15% of them trucks, projected to reach 2,080 by 2042. The structure is 91 ft (27.7 m) long and 44 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesE1680 Bishop RD
CrossesTrib to Wolf Creek
Location.31E JCT SW 52nd ST
RouteCity Street E1680
Coordinates34.57974, -98.45153
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.9 US tons
Inventory rating56.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length91 ft (27.7 m)
Longest span22 ft (6.7 m)
Deck width44 ft (13.4 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,300 (2022)
Projected traffic2,080 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E1680 Bishop RD over Trib to Wolf Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is E1680 Bishop RD over Trib to Wolf Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does E1680 Bishop RD over Trib to Wolf Creek carry?

About 1,300 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is E1680 Bishop RD over Trib to Wolf Creek?

The structure is 91 ft (27.7 m) long with a longest span of 22 ft (6.7 m) and a deck 44 ft wide.

Who owns E1680 Bishop RD over Trib to Wolf Creek?

It is owned by the City or Municipal Highway Agency.