US Bridges

N2567 (14 St.) over Numu Creek

Good

Comanche County, Oklahoma · 0.3 MI N Lee Blvd · Structure no. 194400000000000

Built
1978
47 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
63 ft
4 main spans
Daily traffic
220
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

N2567 (14 St.) over Numu Creek is a concrete culvert carrying N2567 (14 St.) over Numu Creek in Comanche County, Oklahoma. It was built in 1978, so it is 47 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 220 vehicles a day, roughly 5% of them trucks, projected to reach 320 by 2042. The structure is 63 ft (19.2 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesN2567 (14 St.)
CrossesNumu Creek
Location0.3 MI N Lee Blvd
RouteCity Street N2567
Coordinates34.59717, -98.4092
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadUnknown
Structure length63 ft (19.2 m)
Longest span17 ft (5.2 m)
Deck width31 ft (9.3 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic220 (2022)
Projected traffic320 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was N2567 (14 St.) over Numu Creek built?

It was built in 1978, making it 47 years old in 2025.

What condition is N2567 (14 St.) over Numu Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does N2567 (14 St.) over Numu Creek carry?

About 220 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is N2567 (14 St.) over Numu Creek?

The structure is 63 ft (19.2 m) long with a longest span of 17 ft (5.2 m) and a deck 31 ft wide.

Who owns N2567 (14 St.) over Numu Creek?

It is owned by the City or Municipal Highway Agency.