Bailey a Tp (I-44) over U.S. 277 & UP R.R. Und
FairComanche County, Oklahoma · 3.0 MI W SH17 · Structure no. 161640000000000
- Built
- 1964
- 61 years old, rebuilt 1987
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 280 ft
- 5 main spans
- Daily traffic
- 10,000
- 2022 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Bailey a Tp (I-44) over U.S. 277 & UP R.R. Und is a steel stringer/multi-beam or girder carrying Bailey a Tp (I-44) over U.S. 277 & UP R.R. Und in Comanche County, Oklahoma. It was built in 1964 and reconstructed in 1987, so it is 61 years old, older than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,000 vehicles a day, roughly 36% of them trucks, projected to reach 16,000 by 2042. The structure is 280 ft (85.3 m) long and 74 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bailey a Tp (I-44) over U.S. 277 & UP R.R. Und built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1987.
What condition is Bailey a Tp (I-44) over U.S. 277 & UP R.R. Und in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Bailey a Tp (I-44) over U.S. 277 & UP R.R. Und carry?
About 10,000 vehicles per day (2022 count), of which roughly 36% are trucks.
How long is Bailey a Tp (I-44) over U.S. 277 & UP R.R. Und?
The structure is 280 ft (85.3 m) long with a longest span of 60 ft (18.3 m) and a deck 74 ft wide.
Who owns Bailey a Tp (I-44) over U.S. 277 & UP R.R. Und?
It is owned by the State Toll Authority.