US Bridges

S.H. 58 over Creek

Fair

Comanche County, Oklahoma · 4.8 MI.N.JCT.SH49 · Structure no. 006070000000000

Built
1918
107 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
25 ft
1 main span
Daily traffic
1,200
2022 count
Owner
State
State Highway Agency

About this bridge

S.H. 58 over Creek is a concrete stringer/multi-beam or girder carrying S.H. 58 over Creek in Comanche County, Oklahoma. It was built in 1918, so it is 107 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,200 vehicles a day, roughly 15% of them trucks, projected to reach 1,920 by 2042. The structure is 25 ft (7.6 m) long and 27 ft wide. If it were closed, the detour would be 29.8 mi (48 km).

CarriesS.H. 58
CrossesCreek
Location4.8 MI.N.JCT.SH49
RouteState Highway 58
Coordinates34.78052, -98.50688
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72 US tons
Inventory rating27 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 15
Structure length25 ft (7.6 m)
Longest span24 ft (7.3 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,200 (2022)
Projected traffic1,920 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed29.8 mi (48 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.1 million
NavigationNo navigation control on waterway

Frequently asked questions

When was S.H. 58 over Creek built?

It was built in 1918, making it 107 years old in 2025.

What condition is S.H. 58 over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does S.H. 58 over Creek carry?

About 1,200 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is S.H. 58 over Creek?

The structure is 25 ft (7.6 m) long with a longest span of 24 ft (7.3 m) and a deck 27 ft wide.

Who owns S.H. 58 over Creek?

It is owned by the State Highway Agency.