State HWY 49 over Antelope Flat Drainage
FairComanche County, Oklahoma · HWY 49/WEST Exit Road · Structure no. 000021670-00038
- Built
- 1939
- 86 years old, rebuilt 1945
- Condition
- Fair
- inspected April 2022
- Type
- Slab
- Concrete Continuous
- Length
- 30 ft
- 4 main spans
- Daily traffic
- 1,250
- 2022 count
- Owner
- Federal
- Bureau of Fish and Wildlife
About this bridge
State HWY 49 over Antelope Flat Drainage is a concrete continuous slab carrying State HWY 49 over Antelope Flat Drainage in Comanche County, Oklahoma. It was built in 1939 and reconstructed in 1945, so it is 86 years old, older than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,250 vehicles a day, roughly 1% of them trucks, projected to reach 1,250 by 2042. The structure is 30 ft (9.1 m) long and 31 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was State HWY 49 over Antelope Flat Drainage built?
It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1945.
What condition is State HWY 49 over Antelope Flat Drainage in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2022.
How much traffic does State HWY 49 over Antelope Flat Drainage carry?
About 1,250 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is State HWY 49 over Antelope Flat Drainage?
The structure is 30 ft (9.1 m) long with a longest span of 7 ft (2.1 m) and a deck 31 ft wide.
Who owns State HWY 49 over Antelope Flat Drainage?
It is owned by the Bureau of Fish and Wildlife.