FAS 1509 over Clear Boggy Creek
FairCoal County, Oklahoma · 1.0 E of Olney · Structure no. 202900000000000
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 147 ft
- 2 main spans
- Daily traffic
- 200
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 1509 over Clear Boggy Creek is a prestressed concrete stringer/multi-beam or girder carrying FAS 1509 over Clear Boggy Creek in Coal County, Oklahoma. It was built in 1982, so it is 43 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 200 vehicles a day, roughly 10% of them trucks, projected to reach 320 by 2042. The structure is 147 ft (44.8 m) long and 26 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 1509 over Clear Boggy Creek built?
It was built in 1982, making it 43 years old in 2025.
What condition is FAS 1509 over Clear Boggy Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does FAS 1509 over Clear Boggy Creek carry?
About 200 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is FAS 1509 over Clear Boggy Creek?
The structure is 147 ft (44.8 m) long with a longest span of 90 ft (27.4 m) and a deck 26 ft wide.
Who owns FAS 1509 over Clear Boggy Creek?
It is owned by the County Highway Agency.