US Bridges

S.H. 48 over Tell Creek

Fair

Coal County, Oklahoma · 3.0 MI N Johnson Cl · Structure no. 149590000000000

Built
1960
65 years old
Condition
Fair
inspected September 2024
Type
Culvert
Concrete
Length
47 ft
3 main spans
Daily traffic
1,400
2022 count
Owner
State
State Highway Agency

About this bridge

S.H. 48 over Tell Creek is a concrete culvert carrying S.H. 48 over Tell Creek in Coal County, Oklahoma. It was built in 1960, so it is 65 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,400 vehicles a day, roughly 15% of them trucks, projected to reach 2,240 by 2042. The structure is 47 ft (14.3 m) long and 24 ft wide. If it were closed, the detour would be 34.2 mi (55 km).

CarriesS.H. 48
CrossesTell Creek
Location3.0 MI N Johnson Cl
RouteState Highway 48
Coordinates34.46179, -96.42457
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.1 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length47 ft (14.3 m)
Longest span17 ft (5.2 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,400 (2022)
Projected traffic2,240 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed34.2 mi (55 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$644,000
NavigationNo navigation control on waterway

Frequently asked questions

When was S.H. 48 over Tell Creek built?

It was built in 1960, making it 65 years old in 2025.

What condition is S.H. 48 over Tell Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does S.H. 48 over Tell Creek carry?

About 1,400 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is S.H. 48 over Tell Creek?

The structure is 47 ft (14.3 m) long with a longest span of 17 ft (5.2 m) and a deck 24 ft wide.

Who owns S.H. 48 over Tell Creek?

It is owned by the State Highway Agency.