US Bridges

E1160 (se 134th) over Creek

Good

Cleveland County, Oklahoma · .9E of Sooner RD · Structure no. 333760000000000

Built
2023
2 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
38 ft
3 main spans
Daily traffic
100
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

E1160 (se 134th) over Creek is a concrete culvert carrying E1160 (se 134th) over Creek in Cleveland County, Oklahoma. It was built in 2023, so it is 2 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 160 by 2043. The structure is 38 ft (11.6 m) long and 49 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE1160 (se 134th)
CrossesCreek
Location.9E of Sooner RD
RouteCity Street E1160
Coordinates35.33419, -97.40711
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length38 ft (11.6 m)
Longest span12 ft (3.7 m)
Deck width49 ft (15 m)
Roadway width48 ft (14.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic160 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E1160 (se 134th) over Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is E1160 (se 134th) over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does E1160 (se 134th) over Creek carry?

About 100 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is E1160 (se 134th) over Creek?

The structure is 38 ft (11.6 m) long with a longest span of 12 ft (3.7 m) and a deck 49 ft wide.

Who owns E1160 (se 134th) over Creek?

It is owned by the City or Municipal Highway Agency.