US Bridges

Tecumseh RD over Creek

Good

Cleveland County, Oklahoma · 0.3 E of 84th Ave NE · Structure no. 330500000000000

Built
2017
8 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
37 ft
3 main spans
Daily traffic
200
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Tecumseh RD over Creek is a concrete culvert carrying Tecumseh RD over Creek in Cleveland County, Oklahoma. It was built in 2017, so it is 8 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 15% of them trucks, projected to reach 300 by 2042. The structure is 37 ft (11.4 m) long and 33 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesTecumseh RD
CrossesCreek
Location0.3 E of 84th Ave NE
RouteCity Street E1210
Coordinates35.26166, -97.31202
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 17 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45.6 US tons
Inventory rating27.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length37 ft (11.4 m)
Longest span12 ft (3.7 m)
Deck width33 ft (10.1 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic300 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Tecumseh RD over Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is Tecumseh RD over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Tecumseh RD over Creek carry?

About 200 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is Tecumseh RD over Creek?

The structure is 37 ft (11.4 m) long with a longest span of 12 ft (3.7 m) and a deck 33 ft wide.

Who owns Tecumseh RD over Creek?

It is owned by the City or Municipal Highway Agency.