E1180 (34th St.) over Little River
GoodCleveland County, Oklahoma · .4E of Telephone Road · Structure no. 319660000000000
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 95 ft
- 1 main span
- Daily traffic
- 15,930
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
E1180 (34th St.) over Little River is a prestressed concrete stringer/multi-beam or girder carrying E1180 (34th St.) over Little River in Cleveland County, Oklahoma. It was built in 2017, so it is 8 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,930 vehicles a day, roughly 5% of them trucks, projected to reach 20,710 by 2042. The structure is 95 ft (29.1 m) long and 75 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E1180 (34th St.) over Little River built?
It was built in 2017, making it 8 years old in 2025.
What condition is E1180 (34th St.) over Little River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does E1180 (34th St.) over Little River carry?
About 15,930 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is E1180 (34th St.) over Little River?
The structure is 95 ft (29.1 m) long with a longest span of 95 ft (29.1 m) and a deck 75 ft wide.
Who owns E1180 (34th St.) over Little River?
It is owned by the City or Municipal Highway Agency.