US Bridges

IRR E1360 York RD over West Willow Creek

Good

Cleveland County, Oklahoma · .1E of 84th Ave SE · Structure no. 310350000000000

Built
2020
5 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete
Length
25 ft
2 main spans
Daily traffic
100
2022 count
Owner
County
County Highway Agency

About this bridge

IRR E1360 York RD over West Willow Creek is a concrete culvert carrying IRR E1360 York RD over West Willow Creek in Cleveland County, Oklahoma. It was built in 2020, so it is 5 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 160 by 2042. The structure is 25 ft (7.6 m) long and 42 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesIRR E1360 York RD
CrossesWest Willow Creek
Location.1E of 84th Ave SE
RouteCounty Highway E1360
Coordinates35.04382, -97.31536
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.6 US tons
Inventory rating39.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length25 ft (7.6 m)
Longest span25 ft (7.6 m)
Deck width42 ft (12.7 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic100 (2022)
Projected traffic160 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IRR E1360 York RD over West Willow Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is IRR E1360 York RD over West Willow Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does IRR E1360 York RD over West Willow Creek carry?

About 100 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is IRR E1360 York RD over West Willow Creek?

The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m) and a deck 42 ft wide.

Who owns IRR E1360 York RD over West Willow Creek?

It is owned by the County Highway Agency.