US Bridges

IRR E Post Oak RD over Creek

FairPosted for load

Cleveland County, Oklahoma · 0.2 MI E 96th Ave SE · Structure no. 269140000000000

Built
2002
23 years old
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
32 ft
1 main span
Daily traffic
220
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

IRR E Post Oak RD over Creek is a steel stringer/multi-beam or girder carrying IRR E Post Oak RD over Creek in Cleveland County, Oklahoma. It was built in 2002, so it is 23 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 220 vehicles a day, roughly 15% of them trucks, projected to reach 440 by 2042. The structure is 32 ft (9.8 m) long and 30 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesIRR E Post Oak RD
CrossesCreek
Location0.2 MI E 96th Ave SE
RouteCity Street E1280
Coordinates35.16036, -97.29417
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation2: Basically intolerable, requiring high priority of replacement
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating19.1 US tons
Inventory rating11.5 US tons

Structure

MaterialSteel
DeckSteel plate
Main spans1
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span28 ft (8.5 m)
Deck width30 ft (9 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic220 (2022)
Projected traffic440 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$276,000
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR E Post Oak RD over Creek built?

It was built in 2002, making it 23 years old in 2025.

What condition is IRR E Post Oak RD over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does IRR E Post Oak RD over Creek carry?

About 220 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is IRR E Post Oak RD over Creek?

The structure is 32 ft (9.8 m) long with a longest span of 28 ft (8.5 m) and a deck 30 ft wide.

Who owns IRR E Post Oak RD over Creek?

It is owned by the City or Municipal Highway Agency.