19th St. (FAU9260) over I-35 under
GoodCleveland County, Oklahoma · 9.4 MI N Mcclain C/L · Structure no. 254400000000000
- Built
- 2000
- 25 years old, rebuilt 2009
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 272 ft
- 2 main spans
- Daily traffic
- 5,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
19th St. (FAU9260) over I-35 under is a prestressed concrete stringer/multi-beam or girder carrying 19th St. (FAU9260) over I-35 under in Cleveland County, Oklahoma. It was built in 2000 and reconstructed in 2009, so it is 25 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,000 vehicles a day, roughly 5% of them trucks, projected to reach 8,000 by 2042. The structure is 272 ft (82.9 m) long and 68 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 19th St. (FAU9260) over I-35 under built?
It was built in 2000, making it 25 years old in 2025. It was reconstructed in 2009.
What condition is 19th St. (FAU9260) over I-35 under in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does 19th St. (FAU9260) over I-35 under carry?
About 5,000 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is 19th St. (FAU9260) over I-35 under?
The structure is 272 ft (82.9 m) long with a longest span of 134 ft (40.8 m) and a deck 68 ft wide.
Who owns 19th St. (FAU9260) over I-35 under?
It is owned by the State Highway Agency.