US Bridges

IRR FAS 1208 over Lick Creek

Good

Choctaw County, Oklahoma · 5.0 S of Unger · Structure no. 245420000000000

Built
1994
31 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
300 ft
3 main spans
Daily traffic
100
2022 count
Owner
County
County Highway Agency

About this bridge

IRR FAS 1208 over Lick Creek is a prestressed concrete stringer/multi-beam or girder carrying IRR FAS 1208 over Lick Creek in Choctaw County, Oklahoma. It was built in 1994, so it is 31 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 15% of them trucks, projected to reach 160 by 2042. The structure is 300 ft (91.4 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIRR FAS 1208
CrossesLick Creek
Location5.0 S of Unger
RouteCounty Highway 1208
Coordinates33.95372, -95.78192
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating48 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length300 ft (91.4 m)
Longest span100 ft (30.5 m)
Deck width34 ft (10.5 m)
Roadway width33 ft (10 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic160 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$891,000
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR FAS 1208 over Lick Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is IRR FAS 1208 over Lick Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does IRR FAS 1208 over Lick Creek carry?

About 100 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is IRR FAS 1208 over Lick Creek?

The structure is 300 ft (91.4 m) long with a longest span of 100 ft (30.5 m) and a deck 34 ft wide.

Who owns IRR FAS 1208 over Lick Creek?

It is owned by the County Highway Agency.