US Bridges

N4472 (shiloh Rd) over Creek

PoorPosted for load

Cherokee County, Oklahoma · .8N .2E of HWY83/N4470 · Structure no. 310250000000000

Built
2000
25 years old
Condition
Poor
inspected July 2024
Type
Culvert
Concrete
Length
33 ft
3 main spans
Daily traffic
265
2022 count
Owner
County
County Highway Agency

About this bridge

N4472 (shiloh Rd) over Creek is a concrete culvert carrying N4472 (shiloh Rd) over Creek in Cherokee County, Oklahoma. It was built in 2000, so it is 25 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 265 vehicles a day, roughly 10% of them trucks, projected to reach 424 by 2042. The structure is 33 ft (10.1 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesN4472 (shiloh Rd)
CrossesCreek
Location.8N .2E of HWY83/N4470
RouteCounty Highway N4472
Coordinates36.03885, -95.04516
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating45 US tons
Inventory rating26.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length33 ft (10.1 m)
Longest span10 ft (3 m)
Deck width24 ft (7.3 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic265 (2022)
Projected traffic424 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$225,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was N4472 (shiloh Rd) over Creek built?

It was built in 2000, making it 25 years old in 2025.

What condition is N4472 (shiloh Rd) over Creek in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2024.

How much traffic does N4472 (shiloh Rd) over Creek carry?

About 265 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is N4472 (shiloh Rd) over Creek?

The structure is 33 ft (10.1 m) long with a longest span of 10 ft (3 m) and a deck 24 ft wide.

Who owns N4472 (shiloh Rd) over Creek?

It is owned by the County Highway Agency.