E1970 over Creek
FairCarter County, Oklahoma · 5.4W 1S of US70/I-35 · Structure no. 319900000000000
- Built
- 2017
- 8 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 28 ft
- 1 main span
- Daily traffic
- 600
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
E1970 over Creek is a steel stringer/multi-beam or girder carrying E1970 over Creek in Carter County, Oklahoma. It was built in 2017, so it is 8 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 600 vehicles a day, roughly 5% of them trucks, projected to reach 960 by 2042. The structure is 28 ft (8.5 m) long and 27 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E1970 over Creek built?
It was built in 2017, making it 8 years old in 2025.
What condition is E1970 over Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does E1970 over Creek carry?
About 600 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is E1970 over Creek?
The structure is 28 ft (8.5 m) long with a longest span of 28 ft (8.5 m) and a deck 27 ft wide.
Who owns E1970 over Creek?
It is owned by the City or Municipal Highway Agency.