FAU 388 (foreman) over Creek
FairPosted for loadCanadian County, Oklahoma · 6.8E of U.S. 81 · Structure no. 280720000000000
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 20 ft
- 1 main span
- Daily traffic
- 100
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
FAU 388 (foreman) over Creek is a steel stringer/multi-beam or girder carrying FAU 388 (foreman) over Creek in Canadian County, Oklahoma. It was built in 2004, so it is 21 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 160 by 2042. The structure is 20 ft (6.1 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 388 (foreman) over Creek built?
It was built in 2004, making it 21 years old in 2025.
What condition is FAU 388 (foreman) over Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does FAU 388 (foreman) over Creek carry?
About 100 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is FAU 388 (foreman) over Creek?
The structure is 20 ft (6.1 m) long with a longest span of 19 ft (5.8 m) and a deck 30 ft wide.
Who owns FAU 388 (foreman) over Creek?
It is owned by the County Highway Agency.