US Bridges

S.H. 3 EB over Creek

Good

Canadian County, Oklahoma · 1.3 Mi.S.E. JCT.US81 · Structure no. 247820000000000

Built
1997
28 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
198 ft
3 main spans
Daily traffic
3,100
2022 count
Owner
State
State Highway Agency

About this bridge

S.H. 3 EB over Creek is a prestressed concrete stringer/multi-beam or girder carrying S.H. 3 EB over Creek in Canadian County, Oklahoma. It was built in 1997, so it is 28 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,100 vehicles a day, roughly 25% of them trucks, projected to reach 4,960 by 2042. The structure is 198 ft (60.2 m) long and 41 ft wide.

CarriesS.H. 3 EB
CrossesCreek
Location1.3 Mi.S.E. JCT.US81
RouteState Highway 3
Coordinates35.68623, -97.94047
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length198 ft (60.2 m)
Longest span75 ft (22.9 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,100 (2022)
Projected traffic4,960 by 2042
Trucks25%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2 million
NavigationNo navigation control on waterway

Frequently asked questions

When was S.H. 3 EB over Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is S.H. 3 EB over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does S.H. 3 EB over Creek carry?

About 3,100 vehicles per day (2022 count), of which roughly 25% are trucks.

How long is S.H. 3 EB over Creek?

The structure is 198 ft (60.2 m) long with a longest span of 75 ft (22.9 m) and a deck 41 ft wide.

Who owns S.H. 3 EB over Creek?

It is owned by the State Highway Agency.