US Bridges

I-40 EB over Creek

Fair

Canadian County, Oklahoma · 17.8 Mi. E. Caddo CO · Structure no. 166880000000000

Built
1966
59 years old
Condition
Fair
inspected April 2023
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
14,900
2022 count
Owner
State
State Highway Agency

About this bridge

I-40 EB over Creek is a concrete culvert carrying I-40 EB over Creek in Canadian County, Oklahoma. It was built in 1966, so it is 59 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,900 vehicles a day, roughly 43% of them trucks, projected to reach 23,840 by 2042. The structure is 32 ft (9.8 m) long.

CarriesI-40 EB
CrossesCreek
Location17.8 Mi. E. Caddo CO
RouteInterstate 40
Coordinates35.51403, -98.00066
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating100 US tons
Inventory rating100 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,900 (2022)
Projected traffic23,840 by 2042
Trucks43%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$644,000
NavigationNo navigation control on waterway

Frequently asked questions

When was I-40 EB over Creek built?

It was built in 1966, making it 59 years old in 2025.

What condition is I-40 EB over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does I-40 EB over Creek carry?

About 14,900 vehicles per day (2022 count), of which roughly 43% are trucks.

How long is I-40 EB over Creek?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m).

Who owns I-40 EB over Creek?

It is owned by the State Highway Agency.