US Bridges

I-40 WB over Coleman Chapel Rd. under

Good

Canadian County, Oklahoma · 8.2 Mi. E. Caddo Cl · Structure no. 153140000000000

Built
1961
64 years old
Condition
Good
inspected November 2024
Type
Slab
Concrete Continuous
Length
101 ft
3 main spans
Daily traffic
13,050
2022 count
Owner
State
State Highway Agency

About this bridge

I-40 WB over Coleman Chapel Rd. under is a concrete continuous slab carrying I-40 WB over Coleman Chapel Rd. under in Canadian County, Oklahoma. It was built in 1961, so it is 64 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,050 vehicles a day, roughly 43% of them trucks, projected to reach 20,880 by 2042. The structure is 101 ft (30.9 m) long and 43 ft wide.

CarriesI-40 WB
CrossesColeman Chapel Rd. under
Location8.2 Mi. E. Caddo Cl
RouteInterstate 40
Coordinates35.53062, -98.16711
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.1 US tons
Inventory rating46 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length101 ft (30.9 m)
Longest span40 ft (12.2 m)
Deck width43 ft (13.1 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,050 (2022)
Projected traffic20,880 by 2042
Trucks43%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.4 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-40 WB over Coleman Chapel Rd. under built?

It was built in 1961, making it 64 years old in 2025.

What condition is I-40 WB over Coleman Chapel Rd. under in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does I-40 WB over Coleman Chapel Rd. under carry?

About 13,050 vehicles per day (2022 count), of which roughly 43% are trucks.

How long is I-40 WB over Coleman Chapel Rd. under?

The structure is 101 ft (30.9 m) long with a longest span of 40 ft (12.2 m) and a deck 43 ft wide.

Who owns I-40 WB over Coleman Chapel Rd. under?

It is owned by the State Highway Agency.