US Bridges

N2580 over Spring Creek

Good

Blaine County, Oklahoma · 5W 2.8S S.H. 58 & S.H. 8 · Structure no. 294310000000000

Built
2010
15 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
77 ft
1 main span
Daily traffic
30
2022 count
Owner
County
County Highway Agency

About this bridge

N2580 over Spring Creek is a prestressed concrete stringer/multi-beam or girder carrying N2580 over Spring Creek in Blaine County, Oklahoma. It was built in 2010, so it is 15 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, roughly 10% of them trucks, projected to reach 60 by 2042. The structure is 77 ft (23.5 m) long and 29 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesN2580
CrossesSpring Creek
Location5W 2.8S S.H. 58 & S.H. 8
RouteCounty Highway N2580
Coordinates36.075, -98.40611
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating35.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length77 ft (23.5 m)
Longest span73 ft (22.3 m)
Deck width29 ft (8.7 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2022)
Projected traffic60 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N2580 over Spring Creek built?

It was built in 2010, making it 15 years old in 2025.

What condition is N2580 over Spring Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does N2580 over Spring Creek carry?

About 30 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is N2580 over Spring Creek?

The structure is 77 ft (23.5 m) long with a longest span of 73 ft (22.3 m) and a deck 29 ft wide.

Who owns N2580 over Spring Creek?

It is owned by the County Highway Agency.