US Bridges

0366C Matoy RD over Clear Boggy Creek Oflow

Fair

Atoka County, Oklahoma · 1.5E 2.9S of Bentley · Structure no. 242340000000000

Built
1982
43 years old
Condition
Fair
inspected January 2024
Type
Slab
Concrete Continuous
Length
32 ft
2 main spans
Daily traffic
50
2022 count
Owner
County
County Highway Agency

About this bridge

0366C Matoy RD over Clear Boggy Creek Oflow is a concrete continuous slab carrying 0366C Matoy RD over Clear Boggy Creek Oflow in Atoka County, Oklahoma. It was built in 1982, so it is 43 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 15% of them trucks, projected to reach 80 by 2042. The structure is 32 ft (9.8 m) long and 23 ft wide. If it were closed, the detour would be 24.9 mi (40 km).

Carries0366C Matoy RD
CrossesClear Boggy Creek Oflow
Location1.5E 2.9S of Bentley
RouteCounty Highway N3915
Coordinates34.17258, -96.05056
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.1 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2 (+3 approach)
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width23 ft (7.1 m)
Roadway width21 ft (6.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2022)
Projected traffic80 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.9 mi (40 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$276,000
NavigationNo navigation control on waterway

Frequently asked questions

When was 0366C Matoy RD over Clear Boggy Creek Oflow built?

It was built in 1982, making it 43 years old in 2025.

What condition is 0366C Matoy RD over Clear Boggy Creek Oflow in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does 0366C Matoy RD over Clear Boggy Creek Oflow carry?

About 50 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is 0366C Matoy RD over Clear Boggy Creek Oflow?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m) and a deck 23 ft wide.

Who owns 0366C Matoy RD over Clear Boggy Creek Oflow?

It is owned by the County Highway Agency.