US Bridges

U.S. 69 over Limestone Creek & RD Und

Good

Atoka County, Oklahoma · 18.70 N JCT SH-7 · Structure no. 213410000000000

Built
1986
39 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
270 ft
3 main spans
Daily traffic
7,350
2022 count
Owner
State
State Highway Agency

About this bridge

U.S. 69 over Limestone Creek & RD Und is a prestressed concrete stringer/multi-beam or girder carrying U.S. 69 over Limestone Creek & RD Und in Atoka County, Oklahoma. It was built in 1986, so it is 39 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,350 vehicles a day, roughly 29% of them trucks, projected to reach 11,760 by 2042. The structure is 270 ft (82.3 m) long and 41 ft wide.

CarriesU.S. 69
CrossesLimestone Creek & RD Und
Location18.70 N JCT SH-7
RouteU.S. Route 69
Coordinates34.6014, -95.97587
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating105.1 US tons
Inventory rating43.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length270 ft (82.3 m)
Longest span90 ft (27.4 m)
Deck width41 ft (12.5 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,350 (2022)
Projected traffic11,760 by 2042
Trucks29%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2.3 million
NavigationNo navigation control on waterway

Frequently asked questions

When was U.S. 69 over Limestone Creek & RD Und built?

It was built in 1986, making it 39 years old in 2025.

What condition is U.S. 69 over Limestone Creek & RD Und in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does U.S. 69 over Limestone Creek & RD Und carry?

About 7,350 vehicles per day (2022 count), of which roughly 29% are trucks.

How long is U.S. 69 over Limestone Creek & RD Und?

The structure is 270 ft (82.3 m) long with a longest span of 90 ft (27.4 m) and a deck 41 ft wide.

Who owns U.S. 69 over Limestone Creek & RD Und?

It is owned by the State Highway Agency.