Half Bank RD over Muddy Boggy Creek
FairPosted for loadAtoka County, Oklahoma · 1W 3.7N of Lane · Structure no. 009000000000000
- Built
- 1920
- 105 years old, rebuilt 1995
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 37 ft
- 2 main spans
- Daily traffic
- 70
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Half Bank RD over Muddy Boggy Creek is a steel stringer/multi-beam or girder carrying Half Bank RD over Muddy Boggy Creek in Atoka County, Oklahoma. It was built in 1920 and reconstructed in 1995, so it is 105 years old, older than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 70 vehicles a day, roughly 10% of them trucks, projected to reach 112 by 2042. The structure is 37 ft (11.3 m) long and 12 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Half Bank RD over Muddy Boggy Creek built?
It was built in 1920, making it 105 years old in 2025. It was reconstructed in 1995.
What condition is Half Bank RD over Muddy Boggy Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Half Bank RD over Muddy Boggy Creek carry?
About 70 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is Half Bank RD over Muddy Boggy Creek?
The structure is 37 ft (11.3 m) long with a longest span of 19 ft (5.8 m) and a deck 12 ft wide.
Who owns Half Bank RD over Muddy Boggy Creek?
It is owned by the County Highway Agency.