E0300 (fas 0212) over East Clay Creek
FairPosted for loadAlfalfa County, Oklahoma · 3N .7W of SH45/SH8 · Structure no. 034680000000000
- Built
- 1932
- 93 years old, rebuilt 1989
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 22 ft
- 1 main span
- Daily traffic
- 25
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
E0300 (fas 0212) over East Clay Creek is a steel stringer/multi-beam or girder carrying E0300 (fas 0212) over East Clay Creek in Alfalfa County, Oklahoma. It was built in 1932 and reconstructed in 1989, so it is 93 years old, older than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 25 vehicles a day, roughly 15% of them trucks, projected to reach 40 by 2042. The structure is 22 ft (6.7 m) long and 22 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E0300 (fas 0212) over East Clay Creek built?
It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1989.
What condition is E0300 (fas 0212) over East Clay Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does E0300 (fas 0212) over East Clay Creek carry?
About 25 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is E0300 (fas 0212) over East Clay Creek?
The structure is 22 ft (6.7 m) long with a longest span of 22 ft (6.7 m) and a deck 22 ft wide.
Who owns E0300 (fas 0212) over East Clay Creek?
It is owned by the County Highway Agency.