US Bridges

TH30C over Talor Run

Good

Wyandot County, Ohio · 0.20 Miles W of SH67 · Structure no. 8833141

Built
2023
2 years old
Condition
Good
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
38 ft
1 main span
Daily traffic
18
2015 count
Owner
County
County Highway Agency

About this bridge

TH30C over Talor Run is a prestressed concrete box beam or girders - multiple carrying TH30C over Talor Run in Wyandot County, Ohio. It was built in 2023, so it is 2 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18 vehicles a day, roughly 11% of them trucks, projected to reach 25 by 2035. The structure is 38 ft (11.6 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTH30C
CrossesTalor Run
Location0.20 Miles W of SH67
RouteCounty Highway 30
StateOhio
Coordinates40.93508, -83.19659
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating52.9 US tons
Inventory rating37.1 US tons

Structure

MaterialPrestressed Concrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length38 ft (11.6 m)
Longest span37 ft (11.3 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18 (2015)
Projected traffic25 by 2035
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TH30C over Talor Run built?

It was built in 2023, making it 2 years old in 2025.

What condition is TH30C over Talor Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does TH30C over Talor Run carry?

About 18 vehicles per day (2015 count), of which roughly 11% are trucks.

How long is TH30C over Talor Run?

The structure is 38 ft (11.6 m) long with a longest span of 37 ft (11.3 m) and a deck 24 ft wide.

Who owns TH30C over Talor Run?

It is owned by the County Highway Agency.